[Construction Case] Bridge Removal
Amazing technique achieved in one night! Using special construction machinery such as mobile multi-axis dollies and 240t stage jacks.
We would like to introduce a case of "bridge removal" by M. M. Bridge. The highway was closed, and after supporting the bridge with a special trailer equipped with jacking equipment, the bridge was cut. It was then transported to a community ground that served as the work yard and crushed using a concrete crusher. The work involved the use of special construction machinery, including a "mobile multi-axle trailer" developed for transporting super-heavy objects, a "240t stage jack" that excels in horizontal load resistance, and a "large hydraulic crusher" capable of easily crushing large structures. [Overview] ■ The highway was closed, and after supporting the bridge with a special trailer equipped with jacking equipment, the bridge was cut. ■ It was transported to a community ground that served as the work yard and crushed using a concrete crusher. *For more details, please refer to the PDF document or feel free to contact us.
- Company:エム・エムブリッジ
- Price:Other